This posting has been archived
#589510
•
Posted 6/7/2021
New Construction: Crescent Elementary School (K-5) Construction, Bakersfield, CA
- Owner Reference
- Multiple Projects
- Bid Date
- Jun 29, 2021 at 02:00pm
- Pre-Bid
- Scheduled - 6/10/2021 @ 01:00PM @ (for location please or )
- Owner
- Greenfield Union School District, Bakersfield, CA
Description
Crescent Elementary Increment 01 New 51,000 SF (+/-) Elementary School Campus consisting of four classroom buildings, administration building and multi-purpose building. BP#00 Standard Project Requirements (For all Bid Package) BP#06 On an Off Site Asphalt Concrete Paving, Striping, Site Signage and Parking Bumpers (A or C-12) BP#07 On and Offsite Concrete / Structural Concrete and Reinforcing Steel (C-8) BP#08 Concrete Unit Masonry and Reinforcing (C-29) BP#09 Structural Steel and Miscellaneous Steel (C-51) BP#10 Rough Carpentry (B or C-5) BP#11 Gypsum Wall Board, EIFS and Metal Stud Framing (C-9 and C-35) BP#12 Plumbing (C-36) BP#13 Heating Ventilation and Air Conditioning HVAC, Commissioning (C-20) BP#14 Electrical Systems, Equipment and Low Voltage (C-10) BP#15 Fire Sprinklers (C-16) BP#16 Storefront Systems, Entrances, Aluminum Window, Glass and Glazing, Tubular Skylights (C-17) BP#17 Operable Partitions (C-61/D-34) BP#18 PVC Single Ply Roofing Systems, Metal Roofing, Sheet Metal Flashing and Roof Accessories (C-39 and C-43) BP#19 Building Insulation (C-2) BP#20 Ceramic Tile (C-54) BP#21 Doors, Door Frames and Hardware (C-5 or C-6) BP#22 Casework (C-6) BP#23 Finish Carpentry, Miscellaneous Specialties (B) BP#24 Floor Covering (C-15) BP#25 Painting and Concrete Sealer (C-33) BP#26 Acoustical Ceiling, Acoustical Wall Panels, Vinyl Covered Fiber Board (C-2) BP#27 Kitchen and Food Service Equipment (C-43) BP#28 Toilet Partitions and Toilet Accessories (C-61/D-34) BP#29 Stage Curtain and Track (C-61/D-34) BP#30 Chain Link Fencing, Chain Link Gates Ornamental Fencing and Ornamental Gates (C-13 or C-23) BP#31 Overhead Coiling Door (C-61/D-28) BP#32 Athletic Play Field Equipment (C-61/D34) BP#33 Playground Safety Surfacing (C-12 or C-32 or C-33) BP#34 Landscape and Irrigation (C-27) BP#35 Building Signage (C-45 or C-61/D-42) BP#36 Pre-Engineered Shade Structure (B) BP#37 Final Clean (C-61/D-63) BP#38 Concrete Staining, Polishing, Epoxy Floor Covering Liquid Granite (C-33). This project is anticipated to start on approximately 08/01/2021 and is anticipated to have a duration of 210 calendar days for completion. Bonds required. Prevailing wages apply.
Contact
- Sandra Munoz - S.C. Anderson
- (661) 392-7000
- [email protected]
CBS ID: 589510 | Published 6/7/2021 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.