Sign in to your account

Need an account?

Reset your password

Remembered your password?

Create your account

Already have an account?

This posting has been archived

#589513 Posted 6/7/2021

Boggy Creek - 6610 Shelton Rd Erosion Repair & Grade Control, Austin, TX

Owner Reference
IFB 6100 CLMC862
Bid Date
Jul 1, 2021 at 02:00pm
Pre-Bid
Scheduled - 6/17/2021 @ 09:00AM @ (for location please or )
Estimate
$2,295,000
Owner
City of Austin, Purchasing Office, TX

Description

Boggy Creek downstream of US Hwy 183 is a natural channel in highly erosive, Colorado River terrace deposits (sand). The stream is actively meandering with tall cut banks that are threatening private and public infrastructure (Delwau Rd, Shelton Lane, piplines, bike/ped trail, railroad). A portion of this project was completed in 2016 using redirective flow techniques to train the stream and stabilize the lateral movement of meander bends. The remaining elements of the project include a grade control structure at Hwy 183 and a retaining wall system to protect a vulnerable section the Southern Walnut Creek Trail. PWD is contributing funds to the project for trail protection and the CTRMA is contributing funds, by way of an Inter Local Agreement (ILA), for the grade control structure. The project is almost entirely within TxDOT ROW or drainage easement. Currently, the City cannot access the area due to ongoing toll road construction by CTRMA. Bonds required. Prevailing wages. WBE/MBE 1.49% goals. Completion time is 425 calendar days.

Contact

CBS ID: 589513 | Published 6/7/2021 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.