This posting has been archived
#589829
•
Posted 6/9/2021
Terminal D End of Life Electrical & Mechanical Systems, DFW Airport, Dallas, TX
- Owner Reference
- 9500742
- Bid Date
- Jul 9, 2021 at 03:00pm
- Pre-Bid
- Scheduled - 6/8/2021 @ 01:30PM @ (for location please or )
- Owner
- DFW Airport Headquarters, TX
Description
The Work of this Contract is comprised of the following scope tasks within and near Terminal D: 1. Replacement of three (3) loading dock levelers, six (6) dock lock (truck restraint) safety devices, and all associated equipment for the existing six loading dock bays on the service level. 2. Replacement of seventy-one (71) radiant heat units in the ramp work areas. 3. Replacement of the crosswalk safety light system located on the arrival and departure levels between the parking garage and the terminal building near entrance at Gate D31.
4. Refurbishment/replacement of the landside lighting system around the Terminal D parking garage, including roadway accent, planter boxes, arrivals level canopy lights, and sculpture display areas near the entrance at Gate D22. 5. Provide down lighting and additional accent lighting at the entrance to the Terminal D garage building at the approach road on arrivals level Construction will be outside the Airport’s Air Operations Area (AOA). Questions are due by June 21st @ 5:00 PM. Minority/Women Business Enterprise (M/WBE) GOAL: 20%
Contact
- Cynthia Don
- (972) 973-1867
- [email protected]
CBS ID: 589829 | Published 6/9/2021 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.