This posting has been archived
#591250
•
Posted 6/21/2021
VCSA WWTP Rapid Infiltration Basin Improvements, Lady Lake, FL
- Owner Reference
- 21B-036
- Bid Date
- Jul 22, 2021 at 03:00PM
- Pre-Bid
- Scheduled - 6/24/2021 @ 09:00AM @ (for location please or )
- Owner
- The Villages
Description
The intent of this project is to improve the current Rapid Infiltration Basins (RIB). This work includes
installing a soil bentonite slurry wall at the Southwest RIB (#3) Berm to block lateral seepage and prevent offsite flooding. It will also include replacing 18 inches of surface solids with new backfill at the Northeast RIB
(#1) to improve percolation rates. Bonds Required. Prevailing Wages.
Contact
- Kathy Godfrey
- (352) 751-6700
- (352) 751-6715
- [email protected]
CBS ID: 591250 | Published 6/21/2021 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.