#591286 Posted 6/21/2021

Sewer Collection System Pipeline Rehab & Replacement Phase I, San Lorenzo, CA

Owner Reference
45.146.01
Bid Date
Jul 14, 2021 at 02:00pm
Pre-Bid
Encouraged - 6/30/2021 @ 10:00am @ (for location please or )
Estimate
$4 Mil
Owner
Oro Loma Sanitary District

Description

The project work is generally described as: Phase 1: the replacement of 14,117 linear feet of 6 and 8-inch vitrified clay pipe (VCP) with 8-inch high density polyethylene pipe (HDPE); 695 linear feet of 10-inch VCP with 12-inch HDPE pipe, the removal of 178 of slip lined 5-inch HDPE pipe (slip lined HDPE to be pulled out before the 6-inch VCP host pipe is burst with 8-inch HDPE); and the reconnection of all laterals and re-channelization of all manholes, as shown on the plans and specifications. Bonds required. Prevailing wages. Completion 365 calendar days.

Contact

CBS ID: 591286 | Published 6/21/2021 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.