Sign in to your account

Need an account?

Reset your password

Remembered your password?

Create your account

Already have an account?

This posting has been archived

#591350 Posted 6/22/2021

Lake Carroll Park Phase 1, Carrollton, GA

Owner Reference
Not Provided
Bid Date
Jul 1, 2021 at 10:00AM
Pre-Bid
Scheduled - 6/17/2021 @ 10:00AM @ (for location please or )
Owner
City of Carrollton GA

Description

The Project is an expansion to the existing Lake Caroll Park and consists of pavilion structures, paved parking and driveways, playground (finishing's and equipment excluded), multi-use field, and walkways. The project will include site demolition clearing and grubbing, erosion and sediment control (installation, maintenance, and removal of erosion and sediment control BMPs), grading storm drainage, utilities (water, power, and site lighting), asphalt pavement, concrete curb and gutter, concrete walkways, pavilion construction, and grassing. The contractor is expected to manage and stage construction to allow the existing park to remain open during construction with minimal disruptions to the use of the existing park. Bonds required.

Contact

CBS ID: 591350 | Published 6/22/2021 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.