This posting has been archived
#591603
•
Posted 6/23/2021
City of Griffin Roof Replacement City Hall, Griffin, GA
- Owner Reference
- 21-015
- Bid Date
- Jul 15, 2021 at 02:00pm
- Pre-Bid
- Mandatory - 6/30/2021 @ 12:00PM @ (for location please or )
- Owner
- City of Griffin GA
Description
The intention of this guideline is to outline the procedures for the application of a spray Polyurethane foam (SPF) and reflective roof coating system over an existing granulated modified bitumen roof surface. These suggested guidelines describe materials, methods, and conditions necessary for the proper application of the SPF roof coating system. Bonds required.
Contact
- Chris Walker
- (770) 229-6603
- [email protected]
CBS ID: 591603 | Published 6/23/2021 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.