Sign in to your account

Need an account?

Reset your password

Remembered your password?

Create your account

Already have an account?

This posting has been archived

#591628 Posted 6/23/2021

SR 2040 & SR 0885 Road Widening, Allegheny Co., PA

Owner Reference
26623
Bid Date
Jul 15, 2021 at 11:00am
Estimate
$10m-$12.49m
Owner
State of Pennsylvania Department of Transportation PA (PADOT or PENNDOT))

Description

For the milling and resurfacing, concrete pavement rehabilitation, drainage, guide rail, signing and pavement marking, signals, left hand turn lane, and other miscellaneous construction, all within a length of 11,028.39 linear feet (2.09 miles) as indicated on the approved drawings included in the bid package for State Route 2040, Section A22 (Buttermilk Hollow Road/Lebanon Church Road) And State Route 0885, Section A44 (Clairton Road/Lebanon Road), In Allegheny County, West Mifflin Borough Commonwealth of Pennsylvania. This project being situated as follows: From the intersection with Flading Lane at Segment 0170 Offset 0298 (Station 4+50) to a point approximately 340 ft west of Ceco Drive at Segments 0100/0101 Offsets 0140/0057 (Station 132+50). DBE goal 12%. Prequalification required. Prevailing wages apply.

Contact

  • ECMS
  • (855) 783-8330

CBS ID: 591628 | Published 6/23/2021 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.