This posting has been archived
#591643
•
Posted 6/23/2021
Flood Damage Repair Project, Sprague, WA
- Bid Date
- Jul 15, 2021 at 10:00AM
- Pre-Bid
- Scheduled - 7/1/2021 @ 10:00am @ (for location please or )
- Estimate
- $650,000-$700,000
- Owner
- City of Sprague, WA
Description
The project generally consists of the following work: Replacement of the H Street Bridge; erosion repairs at B Street, C Street, D Street, Alder Street, and First Street; and roadway repairs at Colfax Street and Walnut. The work consists of a Base Bid and three (3) Additive Alternates. Thirty (30) working days will be allowed to complete the Base Bid, not including material lead times. Depending on the Additive Alternates awarded, a maximum of Twenty-five (25) additional working days will be allowed. Bonds Required. Prevailing Wages.
Contact
- Dan Remmick
- (509) 838-3810
- [email protected]
CBS ID: 591643 | Published 6/23/2021 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.