This posting has been archived
#591665
•
Posted 6/23/2021
Renovation of the Forsyth County Sheriff's Training Center, Cumming, GA
- Owner Reference
- 21-102-1620
- Bid Date
- Jul 8, 2021 at 02:00pm
- Pre-Bid
- Mandatory - 6/30/2021 @ 10:00am @ (for location please or )
- Owner
- County of Forsyth GA
Description
Contractor to provide metal stud framing at new walls (wood framing shall not be permitted for new work). Contractor to provide Danback flexible wood backing inside metal stud framing for all locations where items will be attached to the finished walls. When sanding or performing dust generating activity in occupied interior spaces: Seal off adjacent spaces from infiltration of dust prior to dust generating activity and remove seals upon completion of work. Cover all air return inlets with temporary construction filters for active HVAC equipment or seal air return inlets for inactive HVAC equipment, prior to conducting dust generating. activities. Remove filters/seals upon completion of dust generating activities. Sanding or dust generating equipment must be provided with filtered vacuums. Replace all HVAC temporary construction filters with new upon completion of the work. Protect all adjacent surfaces and finishes by any and all means necessary. Contractor to protect all existing floor surfaces in the work area with 6 mill plastic sheeting, taped securely at all edges and seems. Contractor shall provide Masonite (or similar as approved by Owner) to protect floor surface. Along construction access. Protect all drain inlets with plugs or secure covers to preclude damage or debris from entering. Contractor shall coordinate with its subcontractors and protect adjacent surfaces from damage by the work of others, including removal and proper disposal of all protection upon completion of work. Contractor assumes the sole risk of loss, injury and destruction of goods, materials, work, property and/or existing conditions and shall protect all project goods, materials, work, property and/or existing conditions through final completion of the project. Finish materials shall not contain spliced pieces less than 8’ long between corners and edges. Construction materials specified for wood finish shall be provided pre-finished from the manufacturer in a pre-finished condition, including but not limited to doors, trims, casings, handrails, chair rails, crown, base cabinetry, shelving. Bonds required.
Contact
- Tyra Little
- (770) 888-8872
- [email protected]
CBS ID: 591665 | Published 6/23/2021 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.