This posting has been archived
#591725
•
Posted 6/23/2021
Hard Rock Rd & Pioneer Dr Phase 2A Improvements, Irving, TX
- Owner Reference
- 074D-21F
- Bid Date
- Jul 16, 2021 at 03:30PM
- Pre-Bid
- Mandatory - 7/7/2021 @ 02:00PM @ (for location please or )
- Owner
- City of Irving, Purchasing, TX
Description
Roadway reconstruction for Hard Rock Road (3U) from the termination of Phase 1A construction to SH183 frontage road and Pioneer Drive (4D) from the intersection of Hard Rock Road to Esters Road. Hard Rock Road consists of the removal of a existing two lane ashphalt street and reconstructing a 41-foot back of curb to back of curb 8-inch concrete street. Pioneer Drive consists of the removal of a two lane asphalt street and reconstructing a 4 lane 10-inch thick concrete street with medians. The reconstruction of these roads includes the replacement of the existing drainage system, illumination, water mains and sanitary sewer mains and the construction of anchored and gravity block retaining walls along with concrete retaining walls required for the project.The work to be performed under this contract consists of furnishing all materials, appurtenances, tools, equipment, labor and incidentals necessary to install complete in place the major work. Q&A due by 07/12/21 at Noon. Bond required. Prevailing wages. DBE goals.
Contact
- Darlene Humphries
- (972) 721-3752
- [email protected]
CBS ID: 591725 | Published 6/23/2021 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.