This posting has been archived
#591808
•
Posted 6/23/2021
Vidler Collection System Pipeline Replacement, Golden, CO
- Owner Reference
- PW6222021
- Bid Date
- Jul 27, 2021 at 11:00am
- Pre-Bid
- Mandatory - 7/9/2021 @ 10:00am @ (for location please or )
- Owner
- City Of Golden CO
Description
The City of Golden owns and operates the Vidler Tunnel which conveys western slope water into the
clear creek basin. Diverted water is collected into a pipeline system that has began to severely degrade.
The pipeline is a mixture of below grade and above grade pipe ranging in diameter from 36-inch in
diameter to 27-inch in diameter. Pipe materials vary typically from steel to CMP. The contractor will be
responsible for removal and replacement of the existing collection pipeline with new Ductile Iron Piping,
and associated appurtenances. Total pipeline length is approximately 2400 LF. Bonds required.
Contact
- William Stambaugh
- (303) 384-8189
- [email protected]
CBS ID: 591808 | Published 6/23/2021 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.