Sign in to your account

Need an account?

Reset your password

Remembered your password?

Create your account

Already have an account?

This posting has been archived

#591846 Posted 6/24/2021

Water System Improvements #2 to Serve the Peach Road Site. Ridgeway, SC

Owner Reference
J – #28260.0002
Bid Date
Jul 8, 2021 at 02:00pm
Pre-Bid
Scheduled - 6/22/2021 @ 10:00am @ (for location please or )
Owner
County of Fairfield

Description

The project consists of the following generally described work: The installation of approximately 6025 Linear Feet of 10” water main, 300 Linear Feet of directional drill, 75 Linear Feet of Jack and Bore with 10” D.I.P. (Ductile Iron Pipe), and 25 Square Yards of Saw Cut remove and replace asphalt pavement. The installation of 11-10” gate valves, 3 air release valve & manholes, and 7 fire hydrant assemblies. e Work will be substantially complete within 180 calendar days after the date when the Contract Times commence to run. Insurance Required. Bonds.

Contact

  • Purchasing
  • (803) 815-4042
  • (803) 635-5969

CBS ID: 591846 | Published 6/24/2021 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.