This posting has been archived
#591862
•
Posted 6/24/2021
Joseph P. Jensen and Robert A. Skinner Water Treatment Plants Battery Energy Storage Systems, Los Angeles, CA
- Owner Reference
- 1998
- Bid Date
- Jul 29, 2021 at 02:00pm
- Pre-Bid
- Mandatory - 6/23/2021 @ 08:00am @ (for location please or )
- Estimate
- $6M - $8 Million
- Owner
- Metropolitan Water District of Southern California
Description
The work consists of development of performance-based plans, permitting, furnishing and construction of 1000kW/4000kWh battery energy storage systems (BESS) at two locations, including BESS control systems, conduits and cables to the power substation, site work grading and paving to support installation of the BESS, and other appurtenant work as specified and shown on the drawings, and the requirements of the SGIP. Prevailing Wages and Bonds. DVBE/SBE 5% goal. Q&A Deadline 06/29/2021 11:59 PM 180 days duration.
Contact
- (213) 217-7602
- [email protected]
CBS ID: 591862 | Published 6/24/2021 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.