Sign in to your account

Need an account?

Reset your password

Remembered your password?

Create your account

Already have an account?

This posting has been archived

#592045 Posted 6/26/2021

Potential Subcontracting Lead - Rehabilitate Parallel & Connecting Taxiways, Phase 1, Santa Maria, CA

Bid Date
Jul 6, 2021 at 02:00pm
Pre-Bid
Mandatory - 6/24/2021 @ 10:00am @ (for location please or )
Estimate
$9,500,000
Owner
Santa Maria Public Airport

Description

The work comprises of the following: • Site preparation including clearing, grubbing, demolition and removals. • In-place grind of existing structural section, temporary stockpile, place back into section. • Earthwork and subgrade preparation. • Construct new structural section including recycled material, aggregate base and asphalt pavement. • Trenching, backfill, and compaction. Installation of airfield electrical systems including conduit, conductor, edge lights and guidance signs. • Airfield pavement marking. • Construction site environmental control including storm water management. • Hydro-mulch erosion control. Bonds required. Prevailing wages apply. M/WBE Goals: 26.6%. Buy American preference.

Contact

  • 805.922.1726
  • 805.922.0677

CBS ID: 592045 | Published 6/26/2021 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.