Sign in to your account

Need an account?

Reset your password

Remembered your password?

Create your account

Already have an account?

This posting has been archived

#592417 Posted 6/30/2021

Delta Building Air Handling Unit Replacement, Houston, TX

Owner Reference
RFP21-004
Bid Date
Jul 20, 2021 at 02:00pm
Pre-Bid
Scheduled - 6/30/2021 @ 10:00am @ (for location please or )
Owner
University of Houston, Clearlake

Description

The Project involves all labor, equipment, materials, and supplies required for replacement of seven (7) air handling units in the Delta Building. This will include replacing two (2) fresh air fans and two (2) dampers. We will also need AHU controls removed from existing units and reinstalled on new units and reconnected to the Siemens BAS System. All controls are currently in operation. There are Reheat units that control several areas in this building, there are 24 reheat units. All reheats have Siemens control valves that will be reused. All reheating units will need to be replaced. Contractors will supply Merv 13 air filters with one replacement set. All disturbed insulation will be repaired. Substantial Completion of the Project shall occur on or before December 31, 2021. Bonds required. HUB Subcontracting plan.

Contact

  • Debra Carpenter
  • (281) 283-2150

CBS ID: 592417 | Published 6/30/2021 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.