This posting has been archived
#592418
•
Posted 6/30/2021
Arbor Building Air Handling Unit Replacement, Houston, TX
- Owner Reference
- RFP21-003
- Bid Date
- Jul 9, 2021 at 03:00pm
- Pre-Bid
- Scheduled - 6/11/2021 @ 10:00am @ (for location please or )
- Owner
- University of Houston, Clearlake
Description
The Project involves all labor, equipment, materials, and supplies required for replacement of five (5) roof top air handling units in the Arbor Building. This includes the chilled water and hot water control valves and actuators and all Siemens temp sensors, static pressure switchs, dampers, actuators and other existing controls. All controls to be connected to existing BAS system. Replace Exhaust Fan Model D18-CCW-TH and Supply fan model FX18BH on Arbor North. Also, all Siemens BAS controls for each unit. Substantial Completion of the Project shall occur on or before December 31 2021. Bonds required. HUB Plan.
Contact
- Debra Carpenter
- (281) 283-2150
CBS ID: 592418 | Published 6/30/2021 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.