Sign in to your account

Need an account?

Reset your password

Remembered your password?

Create your account

Already have an account?

This posting has been archived

#592485 Posted 7/1/2021

Covington Connector - SR 18, Covington, WA

Bid Date
Jul 22, 2021 at 10:00AM
Estimate
$13,598,000-$15,030,000
Owner
City of Covington, WA

Description

This project shall consist of: furnishing all labor, tools, materials, and equipment necessary for construction of the Covington Connector – SR 18 project. Specific work includes, but is not limited to, the installation of two roundabouts at the intersections of the SR 18 Westbound ramps and SE 256th Street and the SR 18 Eastbound ramps and SE 256th Street/Lakepointe Boulevard, ITS improvements, roadway lighting, roadway grading, stormwater drainage, islands, curb and gutter, pedestrian facilities, ADA curb ramps, walls, channelization, signing, landscaping, and other work as shown in the Plans. Bonds Required. Prevailing Wages.

Contact

CBS ID: 592485 | Published 7/1/2021 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.