Design-Build Fremont Hillside Restoration and Stabilization Project - Trade Packages, San Luis Obispo, CA
- Owner Reference
- SP6103
- Bid Date
- Jul 23, 2021 at 03:00PM
- Pre-Bid
- Strongly Recommended - 7/13/2021 @ 10:00am @ (for location please or )
- Owner
- California Polytechnic State University at San Luis Obispo (Cal Poly) CA
Description
Contractors must Pre-qualify with Cal Poly. The Fremont Hillside Restoration and Stabilization Project is a Collaborative Design Build (CDB) Project with Schnabel Geostructural, Design and Construction serving as the Design-Builder. These bid packages focus on the earthwork, grading, and associated work for the larger slope stabilization and rehabilitation of the hillside behind the Fremont dormitory at the Cal Poly, San Luis Obispo campus. Schnabel will be performing the geo-structural construction work to renovate the land slide and is seeking interested bidders to perform the following scopes of work for the project:
1 - PACKAGE 1: Earthwork, Final Grading, and Temporary Erosion Control
2 - PACKAGE 2: Fencing and Site Support
3 - PACKAGE 3: Final Erosion Control
4 - PACKAGE 4: Stormwater & Drainage
5 - PACKAGE 5: Landscape, Courtyard Improvements, & Concrete Hardscape
6 - PACKAGE 6: Survey Layout & Monitoring
Start date: August 23rd Project Durations: 9 months
DVBE participation goal applies.
Contact
- Chris Overby
- (805) 756-5133
- [email protected]
CBS ID: 592514 | Published 7/1/2021 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.