Sign in to your account

Need an account?

Reset your password

Remembered your password?

Create your account

Already have an account?

This posting has been archived

#592514 Posted 7/1/2021

Design-Build Fremont Hillside Restoration and Stabilization Project - Trade Packages, San Luis Obispo, CA

Owner Reference
SP6103
Bid Date
Jul 23, 2021 at 03:00PM
Pre-Bid
Strongly Recommended - 7/13/2021 @ 10:00am @ (for location please or )
Owner
California Polytechnic State University at San Luis Obispo (Cal Poly) CA

Description

Contractors must Pre-qualify with Cal Poly. The Fremont Hillside Restoration and Stabilization Project is a Collaborative Design Build (CDB) Project with Schnabel Geostructural, Design and Construction serving as the Design-Builder. These bid packages focus on the earthwork, grading, and associated work for the larger slope stabilization and rehabilitation of the hillside behind the Fremont dormitory at the Cal Poly, San Luis Obispo campus. Schnabel will be performing the geo-structural construction work to renovate the land slide and is seeking interested bidders to perform the following scopes of work for the project: 1 - PACKAGE 1: Earthwork, Final Grading, and Temporary Erosion Control 2 - PACKAGE 2: Fencing and Site Support 3 - PACKAGE 3: Final Erosion Control 4 - PACKAGE 4: Stormwater & Drainage 5 - PACKAGE 5: Landscape, Courtyard Improvements, & Concrete Hardscape 6 - PACKAGE 6: Survey Layout & Monitoring Start date: August 23rd Project Durations: 9 months DVBE participation goal applies.

Contact

CBS ID: 592514 | Published 7/1/2021 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.