This posting has been archived
#592838
•
Posted 7/5/2021
Bridge Replacement, Gallatin County, IL
- Owner Reference
- 065-99612
- Bid Date
- Jul 30, 2021 at 12:00PM
- Owner
- State of Illinois Department of Transportation (ILDOT) IL
Description
Replace the bridge carrying Eldorado Blacktop Road over North Fork of Saline River, 1.8 miles west of IL. Removal and replacement of existing Eldorado Blacktop Rd Bridge over North Branch Saline River (except for existing piers). The resurfacing of the Eldorado Blacktop roadway from 640 feet west of the bridge to 600 feet east of the bridge. Bonds required. Prevailing wages. DBE goals of 7%. 95 working days.
Contact
- Mark Windsor
- (217) 785-1669
- [email protected]
CBS ID: 592838 | Published 7/5/2021 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.