This posting has been archived
#592872
•
Posted 7/5/2021
Webster St Green Infrastructure Project, Norwalk, CT
- Owner Reference
- TMP 2021-1
- Bid Date
- Jul 23, 2021 at 02:00pm
- Owner
- City of Norwalk, CT
Description
The work to be done under the project includes furnishing all labor, equipment, materials, and services necessary to construct the proposed improvements. Specifically, the work to be done consists of the installation of bio-retention planters, integrated pre-treatment catch basins, a subsurface infiltration system, hydrodynamic separator, storm drainage culverts, project informational signage, plantings, concrete curbing, and bituminous concrete pavement repair and all else necessary and incidental thereto in accordance with construction plans. The proposed work must be completed within 120 calendar days of Notice to Proceed. Deadline for questions is July 15, 2021 by 2:00pm. Bonds and prevailing wages
Contact
- Sharon Conners
- (203) 854-7791
- (203) 857-0143
- [email protected]
CBS ID: 592872 | Published 7/5/2021 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.