2021 IDIQ Right Of Way Chilled Water Contract, Austin TX
- Owner Reference
- IFB 6100 CLMC868
- Bid Date
- Aug 5, 2021 at 02:00pm
- Pre-Bid
- Strongly Encouraged - 7/12/2021 @ 10:00am @ (for location please or )
- Estimate
- $20 Million
- Owner
- City of Austin TX
Description
Provision of pipe, piping hot taps; excavation, tunneling, or boring as required for pipe installation, along with all required casing spacers, tunnel supports, tunnel safety provisions, tunnel dewatering, traffic control provisions including barricades, signage, and safety fencing, valve boxes with traffic rated lids, valve operator stem extensions; butterfly valves and gear operators; air elimination assemblies to include buried traffic-rated enclosure and lid, 2 riser piping, concrete base, shutoff ball valves, automatic air release devices, and associated piping tees and fittings; sediment containment, tree prote3ction, CLSM, pea gravel and grouting, pipe wall penetration seals; assisting Owners chemical testing company; soil compaction; street, curb, and sidewalk repair, communications manholes, with inner duct, raceways, and hooks for communications fiber optic cabling, installation of fiber optic cabling, removal of excavated materials and spoils; along with associated appurtenances and services . " Work under terms aof this Bid package will be awarded under an Idefinite Quantity (IDIQ) contract agreement. Project locations and extent of project work will be determined by Owner and set forth in Owner-provided drawings on an individual basis at such time as an Austin Energy (AE)-Customer agreement is reached for provision of chilled water to Customer by AE. A separate contract for each individual project will be awarded under the terms of these specifications and the IDIQ contract, the dollar amount of the award being determined by the extent of work required by the particular project. The contract term will be for 4 years, with the total construction amount expected not to exceed 20 million. Upon agreement by Owner and contractor this IDIQ contract may be extended for a additional 2 years with a 10 million dollar option. Bonds, Insurance and DBE goals apply.
Contact
- James Matlock
- (512) 322-6273
- [email protected]
CBS ID: 592888 | Published 7/5/2021 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.