This posting has been archived
#592927
•
Posted 7/5/2021
2018 Bond Year 3 Contract 6, Unit 1, Water, Sewer, Paving Improvements, Fort Worth, TX
- Owner Reference
- 101452-2
- Bid Date
- Jul 29, 2021 at 01:30PM
- Pre-Bid
- Strongly Encouraged - 7/15/2021 @ 11:00am @ (for location please or )
- Owner
- City of Fort Worth, TX
Description
Prequalification required. Bonds, Insurance and Prevailing Wages. DBE participation rquirements. The major work will consist of the (approximate) following:
Unit 1: Water Improvements:
3295 LF – 12” Water Line by Open Cut;
2314 LF – 8” Water Line by Open Cut;
13 EA – 12” Gate Valve
11 EA – 8” Gate Valve
8 EA – Fire Hydrant
74 EA – 1” Water Service
2,185 SY – 11” Pavement Pulverization
Unit 2: Sanitary Sewer Improvements:
1030 LF 42" Fiberglass Sewer Pipe by Open Cut
2247 LF 24" Sewer Pipe by Open Cut
1323 LF 8" Sewer Pipe by Open Cut
16 EA 4’ Manhole
8 EA 5’ Manhole
9 EA 6’ Manhole
27 EA 4” Sewer Service
1,980 SY – 11” Pavement Pulverization
Unit 3: Paving Improvements:
10,210 LF – 6” Concrete Curb and Gutter
13,248 SF – 6” Concrete Driveway
14,920 SY – 11” Pavement Pulverization
14,920 SY – 3” Asphalt Pavement
8,200 SF – 4” Concrete Sidewalk
Contact
- Zaki Maged
- (817) 392-5448
- [email protected]
CBS ID: 592927 | Published 7/5/2021 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.