This posting has been archived
#592962
•
Posted 7/5/2021
FM 359 at N. Fulshear Dr. Paving Improvements, Fulshear, TX
- Owner Reference
- 8161-10
- Bid Date
- Jul 14, 2021 at 10:00am
- Estimate
- Will not be disclosed.
- Owner
- CCR West obo Fort Bend Co. MUD No. 198
Description
Scope of Project:
3,050 Tons of HMAC Base;
450 Tons of HMAC Surface Level-Up;
980 Tons of HMAC Surface Overlay;
3,100 SY of Lime-Fly Ash Treated Subgrade;
330 LF of Reinforced Concrete Pipe;
6,400 SY of Milling Existing Pavement;
Pavement Markings; and
Storm Water Pollution Control.
Bonds required.
Contact
- Ethan Demary
- (281) 558-8700
- (281) 558-9701
CBS ID: 592962 | Published 7/5/2021 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.