Sign in to your account

Need an account?

Reset your password

Remembered your password?

Create your account

Already have an account?

This posting has been archived

#593559 Posted 7/11/2021

Well No. 001 Maintenance-Repairs, East Branch Dam, Elk County, PA

Owner Reference
W911WN21B8004
Bid Date
Aug 6, 2021 at 11:00am
Estimate
$250,000 - $500,000
Owner
US Department of the Army, Pitts

Description

Total Small Business Set-Aside NAICS Code: 237110 - Water and Sewer Line and Related Structures Construction The U.S. Army Corps of Engineers, Pittsburgh District, has a requirement for Well No. 001 Maintenance-Repairs at East Branch Dam located in Wilcox, Elk County, PA. Features of the contract include: 1) Replacement of combination submersible groundwater well pump and motor, 2) Pumping/bailing and televising of existing groundwater well (full depth of well), 3) Pumping of backwash disposal system tanks, 4) Replacement of filter greensand, 5) Replacement of filter support bed, 6) Replacement of backwash pump and motor, 7) Replacement of backwash air blower assembly, consisting of positive displaced air blower, electric motor, v-belt and sheaves, belt guard, silencer, check valve, pressure relief valve, 8) Replacement of building interior pressure gages, 9) Replacement of building interior thread piping, 10) Replacement of building interior valves, 11) Installation of roof access hatch to easy access groundwater well pump, 12) All electrical modifications for the water treatment system, The Contractor shall provide all material, labor, and equipment associated with the water system rehabilitation at East Branch Dam. Bonds, insurance & prevailing wages apply.

Contact

CBS ID: 593559 | Published 7/11/2021 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.