Crescent Mills Phase 4 Drainage & Grading, Crescent Mills, CA
- Bid Date
- Jul 28, 2021 at 02:00pm
- Pre-Bid
- Strongly Recommended - 7/21/2021 @ 01:30pm @ (for location please or )
- Owner
- Sierra Institute for Community & Environment, CA
Description
: Project has four tasks and alternate): Phase 4-1: Clear
and grub for all work areas of the site. Includes removal and capping of abandoned 8-inch steel
pipe crossing southern borrow pit and relocating wood chip stockpiles as needed to a location
on-site. Phase 4-2: Remove concrete from Fill Areas 1 and 2 (±15,600 sf) as shown on plans.
Remove from site and replace with equal volume crushed concrete aggregate (2-inch minus) or
equivalent aggregate fill. Phase 4-3: Excavate soil from existing borrow pits (±5,500 cy in place),
and place over Fill Areas 1, 2 and 3 as shown on the plans. Grade and compact to 90%. Place top
lift (6-inch compacted) crushed concrete aggregate from site stockpile or import on Fill Areas 1B,
2B and 3 as shown on plans. Stockpile any unused borrow soil on site as shown on plans. Phase
4-4: Install new drainage swales and spillways between borrow pits and existing infiltration pond
as shown on plans. Alternate 1: Remove asphalt pavement from AC Replacement area shown on
plans. Process and place as graded aggregate subgrade. Re-pave areas shown on plans; 5-inches
AC and 12-inches aggregate subgrade with positive drainage to swales and borrow pits. Bonds required. Prevailing wages apply. DBE incentives. Completion date is 8/16/21.
Contact
- Danielle Berry
- (530) 284-1022
- (530) 284-1023
- [email protected]
CBS ID: 593780 | Published 7/13/2021 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.