This posting has been archived
#593849
•
Posted 7/13/2021
Fort Sherman Dam Spillway Gate Replacement, Mount Pleasant, Titus Co., TX
- Owner Reference
- TCF20283
- Bid Date
- Aug 10, 2021 at 10:00AM
- Pre-Bid
- Mandatory - 7/26/2021 @ 09:00AM @ (for location please or )
- Estimate
- $6 - $9 million
- Owner
- Titus Co. Fresh Water Supply District 1, TX
Description
This Project consists of the fabrication and installation of four (4) new spillway tainter gates, including the removal and disposal of the existing spillway gates. Additional items include: 1. Fabrication and Installation of New spillway tainter gate hoists 2. Repair of the low-flow sluice gate 3. Installation of mechanical actuators for the low-flow valve 4. Fabrication of a new stoplog lifting beam 5. Installation of a radio-based SCADA system with cameras for remote gate operation. This includes installation of a lighting system at the gates. Bonds required. Prevailing wages apply.
Contact
- (903) 572-1844
CBS ID: 593849 | Published 7/13/2021 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.