Sign in to your account

Need an account?

Reset your password

Remembered your password?

Create your account

Already have an account?

This posting has been archived

#593849 Posted 7/13/2021

Fort Sherman Dam Spillway Gate Replacement, Mount Pleasant, Titus Co., TX

Owner Reference
TCF20283
Bid Date
Aug 10, 2021 at 10:00AM
Pre-Bid
Mandatory - 7/26/2021 @ 09:00AM @ (for location please or )
Estimate
$6 - $9 million
Owner
Titus Co. Fresh Water Supply District 1, TX

Description

This Project consists of the fabrication and installation of four (4) new spillway tainter gates, including the removal and disposal of the existing spillway gates. Additional items include: 1. Fabrication and Installation of New spillway tainter gate hoists 2. Repair of the low-flow sluice gate 3. Installation of mechanical actuators for the low-flow valve 4. Fabrication of a new stoplog lifting beam 5. Installation of a radio-based SCADA system with cameras for remote gate operation. This includes installation of a lighting system at the gates. Bonds required. Prevailing wages apply.

Contact

  • (903) 572-1844

CBS ID: 593849 | Published 7/13/2021 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.