Sign in to your account

Need an account?

Reset your password

Remembered your password?

Create your account

Already have an account?

This posting has been archived

#593851 Posted 7/13/2021

2022 Street Rehabilitation Task Order Pkg 3, San Antonio, TX

Owner Reference
23-01874-03 (Pkg 3)
Bid Date
Aug 6, 2021 at 02:00pm
Pre-Bid
Scheduled - 7/19/2021 @ 10:00am @ (for location please or )
Estimate
$5,000,000.00
Owner
City of San Antonio TX

Description

Project construction may include but is not limited to: full reconstruction, subgrade treatment, base and surface coarse installations, new hot mix surface course application, base and pavement replacement, concrete curbs, sidewalks, driveways, concrete retaining walls combination type, wheelchair ramps, removing and relocating mailboxes, asphalt speed humps, topsoil, sodding, signage, striping, elevated sidewalks, sidewalk pipe railing, adjusting existing meter boxes, valve boxes and manholes, tree pruning, removal and/or replacement, and any other items required due to the site conditions to accomplish the project scope.

Contact

CBS ID: 593851 | Published 7/13/2021 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.