Sign in to your account

Need an account?

Reset your password

Remembered your password?

Create your account

Already have an account?

This posting has been archived

#593856 Posted 7/14/2021

Kitchen Production Line and Dish Washing Area Renovation, Trenton, NJ

Bid Date
Aug 6, 2021 at 02:00pm
Pre-Bid
Scheduled - 7/16/2021 @ 02:00pm @ (for location please or )
Owner
Trenton, NJ Soup Kitchen

Description

Demolition of existing kitchen equipment Demolition of existing tile wall finish and gyp board in dishwash area Uncrate, set in place, and connect all kitchen equipment as indicated on the equipment list (to be provided by TASK) New epoxy floor finish throughout the kitchen and back storage areas. New dropped ACT ceiling in new secondary kitchen area which is currently open to structure Demolish existing grid and add new ACT grid in main kitchen area. New acoustic ceiling tile in existing main kitchen area Replacement of all existing kitchen and back storage area lighting with new LED fixtures in same locations. This includes 2x4 lay-in fixtures and linear pendant fixtures. New gyp board and FRP wall panels at walls in dishwash area Associated changes to existing mechanical, electrical, plumbing, and fire protection required by new equipment and layout change.

Contact

  • Paul Jensen
  • (609) 695-5456

CBS ID: 593856 | Published 7/14/2021 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.