This posting has been archived
#593894
•
Posted 7/14/2021
Road Rehabilitation Program 20/21, Hollister, CA
- Owner Reference
- C2005
- Bid Date
- Jul 28, 2021 at 03:00pm
- Pre-Bid
- Scheduled - 7/14/2021 @ 10:00am @ (for location please or )
- Estimate
- $1,077,000
- Owner
- City of Hollister CA
Description
Work consists of pavement rehabilitation work along multiple residential roadway segments. The work includes slurry seal, cold planing existing AC pavement and HMA overlay, base failure repair, curb ramp reconstruction, and conform paving. Utility adjustments necessary to complete pavement grinding and overlay work and signing and striping are included in this project. Bonds, insurance & prevailing wages apply.
Contact
- Renee Perales x1117
- (831) 636-4300
- (831) 634-4913
- [email protected]
CBS ID: 593894 | Published 7/14/2021 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.