This posting has been archived
#594020
•
Posted 7/15/2021
Paving Project, Vancouver, WA
- Owner Reference
- 21-21
- Bid Date
- Jul 29, 2021 at 02:00pm
- Pre-Bid
- Scheduled - 7/20/2021 @ 02:00PM @ (for location please or )
- Estimate
- $382,750 - $422,900
- Owner
- Port of Vancouver, WA
Description
The Terminal 3 – 2021 Paving Project grinds and inlays 3”- 5” of asphalt concrete in specified locations of Terminal 3 at the Port of Vancouver. Work includes striping following the final lift of HMA and construction staging to ensure the berths remain operational. Bonds Required. Prevailing Wages.
Contact
- Randy McCaleb
- (360) 823-5286
- [email protected]
CBS ID: 594020 | Published 7/15/2021 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.