Sign in to your account

Need an account?

Reset your password

Remembered your password?

Create your account

Already have an account?

This posting has been archived

#594059 Posted 7/15/2021

Harbour Reach Drive Improvements, Mukilteo, WA

Owner Reference
TR210101
Bid Date
Aug 4, 2021 at 02:00pm
Estimate
$850,000-$950,000
Owner
City of Mukilteo WA

Description

The work to be performed under these specifications consists of furnishing all labor, tools, materials, and equipment necessary for construction of the Harbour Reach Drive Improvements. Specific work includes, but is not limited to, HMA pavement overlay, HMA pavement repair, pavement grinding, installation of cement concrete curb ramps, replacement of concrete sidewalk panels, utility adjustments to grade, pavement striping. pavement markings, permanent signing, and advanced traffic loops. Bonds Required. Prevailing Wages.

Contact

CBS ID: 594059 | Published 7/15/2021 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.