Sign in to your account

Need an account?

Reset your password

Remembered your password?

Create your account

Already have an account?

This posting has been archived

#594093 Posted 7/15/2021

HVAC System Replacement for Executive Plaza, Fredericksburg, VA

Owner Reference
22-0202
Bid Date
Aug 5, 2021 at 01:00pm
Pre-Bid
Scheduled - 7/27/2021 @ 11:30am @ (for location please or )
Owner
City of Fredericksburg, VA

Description

The project involves the renovation of the second, third, fifth, sixth, and seventh floors of the Executive Plaza Building. Interior walls/partitions, ceiling, ceiling mounted devices, and lights, shall remain in their current states. Existing air handling unit (AHU) and associated ductwork systems shall be removed. Existing perimeter fan coil shall be abandoned in place and existing hydronic piping shall be removed. Electrical circuits feeding mechanical systems shall be removed back to source. New variable refrigerant flow (VRF), dedicated outside air systems (DOAS), associated ductwork and piping will be added on each floor as indicated. New mechanical systems will be connected to existing panels as indicated. Q&A due by 4pm, 7/29/21. Bonds required.

Contact

CBS ID: 594093 | Published 7/15/2021 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.