Construction Manager Services for Zone 11W Tank & Booster Pump Project, Santaquin, UT
- Owner Reference
- SANT202215881
- Bid Date
- Aug 5, 2021 at 02:00pm
- Owner
- City of Santaquin Utah
Description
Santaquin City is seeking to enter into an agreement with a qualified and motivated
Construction Manager/General Contractor (CM/GC) firm to provide Construction
Manager/General Contractor services for assisting the City and the City’s contracted Engineer
(Hansen, Allen & Luce) with detailed design and construction of the Zone 11 West Pressurized
Irrigation System (Project) improvements. The Project consists of irrigation transmission
pipelines, a booster pump station, and storage tank and includes the following facilities.
1. Zone 11 West Storage Tank: A 10 ac-ft (3.26 million gallon) storage tank is to be located
in the area of the existing Zone 11 West drinking water storage tank. The tank is to be
conventional cast-in-place reinforced concrete, or a post tensioned (AWWA D115), or a
prestressed (AWWA D110) type tank with an open top.
2. 24-Inch Transmission Pipeline 1: Approximately 5,700-feet of 24-inch PVC C900 DR18
pipeline is to connect to the existing 24-inch pipeline near the intersection of 14400
South (Utah County Coordinates) and 600 West (Santaquin City Coordinates) and
extend west, crossing the UPRR tracks through an existing casing and connecting to the
existing 24-inch pressurized irrigation pipeline near to Summit Ridge Parkway and
Flagstone Drive.
3. 24-inch Transmission Pipeline 2: Approximately 1,200-feet of 24-inch PVC C900 DR18
pipeline to connect the existing pressurized irrigation in the Summit Ridge, Stone Hollow
area with the suction side of the pump station.
4. Zone 11 West Pump Station: The pump station will be located near the intersection of
Mountain View Drive and Summit Trails where it will connect to the new 24-inch
Transmission Pipeline 2 (suction) and new 16-inch Transmission Pipeline 1 (discharge).
The pump station is to have a capacity of 3,000 GPM. The pump station will include
space for future drinking water pumps and piping.
5. 16-inch Transmission Pipeline 1: Approximately 4,700-feet of 16-inch PVC C900 DR18
pipeline is to connect the Zone 11 West Pump Station to the Zone 11 West Storage.
6. 16-inch Transmission Pipeline 2: Another 3,050-feet of 16-inch PVC C900 DR18
pipeline is to extend from the Zone 11 West Tank to connect to the existing pressurized
irrigation system near the intersection of Vista Ridge Road and Sageberry Drive.
Construction of the irrigation storage tank and the 16-inch transmission pipeline from the tank to
the existing pressurized irrigation system near the intersection of Vista Ridge Road and
Sageberry Drive are to be completed and ready for use by mid-April 2022. The construction of
the pump station and other pipelines are anticipated to follow later in 2022. Bonds required. Prevailing wages apply.
Contact
- Jon Lundell
- (801) 754-1011
- [email protected]
CBS ID: 594184 | Published 7/17/2021 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.