This posting has been archived
#594458
•
Posted 7/19/2021
Furnish and Install an AOP Treatment System at the Smith Street Pumping Station, East Farmingdale, NY
- Owner Reference
- 7782
- Bid Date
- Aug 31, 2021 at 11:00am
- Pre-Bid
- Mandatory - 8/5/2021 @ 10:00am @ (for location please or )
- Owner
- County of Suffolk Water Authority NY
Description
The Suffolk County Water Authority is inviting bids for the labor, materials, tools, and equipment necessary to complete the Furnish and Install an AOP Treatment System at the Smith St Pumping Station. The work includes but is not limited to the furnishing and installing of a complete advanced oxidation process (AOP) water treatment system and a pre-engineered metal building extension. Bonds and prevailing wages
Contact
- Marlon Torres
- (631) 563-0334
- (631) 589-5268
- [email protected]
CBS ID: 594458 | Published 7/19/2021 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.