This posting has been archived
#594515
•
Posted 7/20/2021
Reclaimed Water Transmission Main Everest Pkwy & Everest WRF Reclaimed Water System Modification, Cape Coral, FL
- Owner Reference
- BUT2199KR-0-2021
- Bid Date
- Aug 25, 2021 at 01:30PM
- Pre-Bid
- Mandatory - 7/27/2021 @ 10:00am @ (for location please or )
- Owner
- City of Cape Coral
Description
The Work for the Reclaimed Water Transmission Main and Everest Water Reclamation Facility (WRF) Modifications generally involves the construction of a new reclaimed water distribution header system and associated appurtenances and controls within the Everest WRF along with the installation of a new 24” ductile iron pipe reclaimed water transmission main and associated appurtenances from the Everest Water Reclamation Facility east along the north side of Everest Parkway to Horton Park. Bonds Required. Prevailing Wages.
Contact
- Kathy Rose
- (239) 574-0411
CBS ID: 594515 | Published 7/20/2021 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.