This posting has been archived
#594927
•
Posted 7/23/2021
District 56 Signage Project, Elk Grove, CA
- Owner Reference
- FM2106
- Bid Date
- Aug 10, 2021 at 10:00AM
- Pre-Bid
- Scheduled - 7/29/2021 @ 09:00AM @ (for location please or )
- Estimate
- $166,000
- Owner
- City of Elk Grove, Purchasing, CA
Description
The proposed Work shall include but not be limited to the following: fabrication and installation of monument signs or “primary signs” at two locations (Civic Center Drive at the vehicle entrance to the Community Center parking lot and Big Horn Boulevard vehicle entrance to the Aquatics Center parking lot (Add Alternate A) and the Preserve (also referred to as the “Nature Area”) trail entry signs or “secondary signs” at three locations at the City owned District56 site. The Plans, with details specified are provided to the Contractor, which they shall intern use to create Shop Drawings consistent with those Plans to fabricate the signs. The Work shall consist of but not be limited to the following: fabrication of all signs (Base Bid and Add Alternate A), prepare each location to receive the new signs, fabricate, and install fabricated primary signs, modify the electrical at the primary signs for the internally illuminated light for the sign, and install fabricated kickplate to the existing light. The Project will result in the fabrication and installation of two primary signs (if Bid Alternate A is awarded) with adjustments to the existing lighting and addition of internally illuminated sign to improve visibility of the primary signs at night, and three separate secondary signs as shown on the Plans and as specified in these Project specifications and Contract Documents. Project Duration: First Order of Work: 60 Working Days. Second Order of Work: 15 Working Days. Online Q & A Deadline is 08/02/2021 8:00 AM. Bonds required. Prevailing wages apply.
Contact
- Kim Brown
- (916) 627-3316
- (916) 691-3173
- [email protected]
CBS ID: 594927 | Published 7/23/2021 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.