This posting has been archived
#594951
•
Posted 7/24/2021
CLI-IR 71-12.13/13.99, Bridge Replacement (2 Bridges), Clinton Co, OH
- Owner Reference
- 210474
- Bid Date
- Aug 26, 2021 at 02:00pm
- Owner
- State of Ohio Department of Transportation OH (OHDOT)
Description
DBE Goal: 10.0% Per plans & specs, constructing Bridge Nos S CLI-71-1213 L/R, three span continuous concrete slabs on capped pile substructures, (spans 34'-9",42'-6", 34'-9"; roadway 64' toe/toe of parapet), I-71 over Anderson Fork and by constructing Bridge no SCLI-1399 L/R, three span continuous concrete slabs on capped pile substructures, (spans: 24'-9",30', 24'-9"; roadway: 64' toe/te of parapet), I-71 over Grassy Run. Bonds, insurance & prevailing wages apply.
Contact
- Dave Slatzer
- (614) 466-3598
CBS ID: 594951 | Published 7/24/2021 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.