This posting has been archived
#595273
•
Posted 7/27/2021
Adams Dr. Sidewalk Project, Phase 1. Abbeville, SC
- Owner Reference
- Adams Dr. Sidewalk Project
- Bid Date
- Aug 5, 2021 at 01:00pm
- Pre-Bid
- Scheduled - 7/23/2021 @ 11:00am @ (for location please or )
- Owner
- City of Abbeville, SC
Description
The work consists of the installation of approximately 325 Linear Feet of concrete curb and gutter. 505 Linear feet of 5" wide sidewalk. 40 Linear Feet of 18" RCP (Reinforced Concrete Pipe). 20 Linear feet of 15" ADS (Advanced Drainage System) N-12. 24 Linear Feet of 8" ADS N-12. One Catch basin. One ADA (Americans with Disabilities Act) concrete handicap ramp. One Concrete Parking Pad, 2 wheelstops, 500 cubic yards of backfill and grassing. Bonds.
Contact
- Purchasing
- (864) 366-5017
CBS ID: 595273 | Published 7/27/2021 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.