Sign in to your account

Need an account?

Reset your password

Remembered your password?

Create your account

Already have an account?

This posting has been archived

#595273 Posted 7/27/2021

Adams Dr. Sidewalk Project, Phase 1. Abbeville, SC

Owner Reference
Adams Dr. Sidewalk Project
Bid Date
Aug 5, 2021 at 01:00pm
Pre-Bid
Scheduled - 7/23/2021 @ 11:00am @ (for location please or )
Owner
City of Abbeville, SC

Description

The work consists of the installation of approximately 325 Linear Feet of concrete curb and gutter. 505 Linear feet of 5" wide sidewalk. 40 Linear Feet of 18" RCP (Reinforced Concrete Pipe). 20 Linear feet of 15" ADS (Advanced Drainage System) N-12. 24 Linear Feet of 8" ADS N-12. One Catch basin. One ADA (Americans with Disabilities Act) concrete handicap ramp. One Concrete Parking Pad, 2 wheelstops, 500 cubic yards of backfill and grassing. Bonds.

Contact

  • Purchasing
  • (864) 366-5017

CBS ID: 595273 | Published 7/27/2021 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.