Sign in to your account

Need an account?

Reset your password

Remembered your password?

Create your account

Already have an account?

This posting has been archived

#595291 Posted 7/27/2021

Morris - Bryan Energy Center Drainage Improvements. Columbia, SC

Owner Reference
J12-9898
Bid Date
Aug 10, 2021 at 02:00pm
Pre-Bid
Scheduled - 7/17/2021 @ 02:00pm @ (for location please or )
Estimate
$100,000 to $120,000
Owner
State of South Carolina Department of Mental Health SC

Description

Bid consisting of replacing approximately 264 Linea Feet (LF) of 15-inch RCP (Reinforced Concrete Pipe), 49 LF of 18-inch RCP, 24-inch RCP, and miscellaneuous appurtenances; installation of 154 LF of 12-inch HDPE (High-density Polyethylene) pipe, 150 LF of 4-inch CPP (Concrete Pressure Pipe) or PVC (Polyvinyl Chloride) underdrain, 3 junction boxes, 2 catch basins, associated rip rap and grading. Alternate 1 consisting of sliplining 33 LF of existing 12-inch RCP with 10-inch fusible PVC. Alternate 2 consisting of removal and replacement of 33LF of existing 12-inch RCP with HDPE pipe. Insurance Required. Bonds.

Contact

CBS ID: 595291 | Published 7/27/2021 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.