This posting has been archived
#595348
•
Posted 7/27/2021
Billy's Creek Restoration Dredging Phase 2, Fort Myers, FL
- Owner Reference
- 12-21
- Bid Date
- Aug 24, 2021 at 02:00pm
- Pre-Bid
- Scheduled - 8/2/2021 @ 02:00PM @ (for location please or )
- Owner
- Town of Fort Myers Beach FL
Description
The City of Fort Myers proposes to dredge up to 7,100 cubic yards of material from Billy’s Creek, remove or displace 200e linear feet of failed concrete block bulkhead, and install 5,492 linear feet of geotextile tube shoreline stabilization. The work is to be done within the waterway located in the City of Fort Myers, Florida.
Bonds Required. Prevailing Wages.
Contact
- Paula Carter
- (239) 321-7241
- [email protected]
CBS ID: 595348 | Published 7/27/2021 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.