This posting has been archived
#595352
•
Posted 7/27/2021
West Gore St Phase 2 Sanitary Sewer & Water Replacement, Orlando, FL
- Owner Reference
- IFB21-0351
- Bid Date
- Aug 25, 2021 at 02:00pm
- Pre-Bid
- Scheduled - 8/5/2021 @ 10:00am @ (for location please or )
- Estimate
- $5,750,000
- Owner
- City of Orlando, FL
Description
This proposed project is to replace gravity sanitary sewer, and installation and removal of water-main lines along Gore Street. The gravity sewer replacement includes open cut methodology to install approximated 3,000 Ln feet of 24 inch pipe to an average depth of 19 feet. Bore & jack and directional drill will be used in some places and removal and abandon of existing sewer. The project also includes installation of 8 inch and 10 inch gravity sewer pipe, lateral connections, manholes, roadway improvements and other work as stated in the plans and specifications. The water-main replacement will consist mostly of 12 inch and 16 inch pipe with associated services. The project will be done in phases. Bonds Required. Prevailing Wages.
Contact
- Silvia Coste
- (407) 246-2216
- [email protected]
CBS ID: 595352 | Published 7/27/2021 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.