This posting has been archived
#595384
•
Posted 7/27/2021
Paradise Creek Mitigation Project at Kimball Way, National City, CA
- Owner Reference
- CIP 19-35
- Bid Date
- Aug 17, 2021 at 11:00AM
- Pre-Bid
- Scheduled - 8/3/2021 @ 10:00am @ (for location please or )
- Estimate
- $620,155.00
- Owner
- City of National City, Engineering, CA
Description
The general scope of work is to repair sections of Paradise Creek at Kimball Way, including removal of existing concrete lining on south creek bank, earthwork and regrading, and installing articulated concrete blocks and cutoff wall on south creek bank. Drainage improvements include adding bar screen gates at the outlet and inlet of existing reinforced concrete box storm drains, and rip rap. Other site improvements include retaining wall, concrete driveways, DG access road and perimeter wrought iron fencing and access gates to secure the area. Project duration is 120 working days. Bonds required. Prevailing wages apply.
Contact
- Luca Zappiello
- (619) 336-4360
- [email protected]
CBS ID: 595384 | Published 7/27/2021 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.