This posting has been archived
#595387
•
Posted 7/27/2021
Lincoln Ave. Cold Pavement Recycling, Fresno, CA
- Owner Reference
- 21-02-C / STPL 5942(300)
- Bid Date
- Aug 26, 2021 at 02:00pm
- Estimate
- $11,875,000 to $13,125,000
- Owner
- County of Fresno CA
Description
The work to be done consists, in general, of recycling the existing surface of Lincoln Avenue, between SR 145 and the Grantland Avenue alignment, using an on-site Cold Central Plant Recycling (CCPR) technique and adding paved 4-foot wide shoulders, traffic striping, and shoulder backing. The CCPR technique establishes an on-site central locations to recycle and reconstruct the existing road’s pavement and will include cold planing 6 inches of the existing road’s surface and placing back the recycled material and then adding a 0.2 foot hot mix asphalt overlay. A varying thickness overlay with pavement interlayer will also be placed from Grantland Avenue alignment to Fig Avenue. Federally funded. DBE Goal: 12%. Subject to Buy America provisions. Subject to Cargo Preference Act. Bonds required. Prevailing wages apply.
Contact
- Public Works & Planning Dept
- (559) 600-9908
- [email protected]
CBS ID: 595387 | Published 7/27/2021 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.