This posting has been archived
#595414
•
Posted 7/28/2021
Nolan Road Park Improvements: Phase II, Township of Marlboro, NJ
- Owner Reference
- 2021-21
- Bid Date
- Aug 11, 2021 at 10:30am
- Owner
- Township Of Marlboro NJ
Description
The project consists of the reconstruction of the existing basketball court, existing ball field infield, and improvements to the existing playground area. Additionally, drainage improvements, signage, and walkway improvements are included within this project. The basketball court will be completely removed and replaced, including new basketball goal systems, players benches, and acrylic color coating of the court surface. The existing ball field amenities will be removed and replaced with a new chain link backstop, chain link fencing, player’s benches, and bases. Additionally, the existing infield will receive additional clay to amend the overall layout of the infield. The existing playground will be upgraded, including new curbing, play structures (by others), and safety surfacing (by others). Overall signage and drainage improvements are also included within this project. Bonds required. Prevailing wages apply.
Contact
- Jonathan Capp
- (732) 536-0200
- [email protected]
CBS ID: 595414 | Published 7/28/2021 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.