This posting has been archived
#595946
•
Posted 8/2/2021
Fort Upper Basin Water and Wastewater Pipeline Renewal, Austin TX
- Owner Reference
- IFB 6100 CLMPC877
- Bid Date
- Sep 9, 2021 at 02:00pm
- Pre-Bid
- Mandatory - 8/10/2021 @ 10:00am @ (for location please or )
- Estimate
- $2,968.734
- Owner
- City of Austin TX
Description
The work consists of the replacement of approximately 7,000 linear feet of 8-inch wastewater collection pipeline and 700-linear feet of water distribution pipeline located in the street right-of-way, and associated manholes, services, valves and appurtenances, pavement and concrete repairs, traffic controls, and erosion and sedimentation control. DBE/MBE/WBE participation requirements. Project location: 2901 to 3109 Rogge Ln, 3012 to 3204 Rexford Dr, 5401 to 5513 Claymore Dr, 5401 to 5701 Gloucester Ln, 5501 to 5609 Cordell Ln, 5500 to 5604 Ameswood Dr, 3300 to 3400 Woodbriar Ln, 5400 to 5405 Chevy Circle and 3010 Norwood Hill Road. Final completion 30 calendar days.
Bonds, Insurance and Prevailing Wages
Contact
- David Hernandez
- (512) 974-3014
- [email protected]
CBS ID: 595946 | Published 8/2/2021 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.