This posting has been archived
#596013
•
Posted 8/2/2021
SOQ Silicon Valley Phase II Extension Program / Stations Contract, San Jose, CA
- Owner Reference
- S20241
- Bid Date
- Sep 23, 2021 at 02:00pm
- Pre-Bid
- Encouraged - 7/12/2021 @ 01:00PM @ (for location please or )
- Owner
- Santa Clara Valley Transportation Authority
Description
Statements of Qualification required for esign-Build (“DB”) contract for the design and construction of all components of the stations required under Contract Package 4 (the “Stations Project”). A Short-List of up to four (4) of the highest-ranked Respondents will be created, each of which will be invited to submit proposals in response to VTA’s forthcoming Request for Proposals (RFP). Respondents that are not included on the Short-List will not be allowed to submit proposals. Contract Package 4 Stations ("Project") consists of three underground stations intercepting the tunnel alignment which begins at the terminus of the BART Silicon Valley Phase I (“BSVI”) project, south of Mabury Road in the City of San Jose. Continuing in an at-grade configuration, the alignment will then descend into a tunnel curving below U.S. 101, arriving at 28th Street/Little Portugal Station, before aligning under the main thoroughfare of Santa Clara Street to the Downtown San Jose Station (DTSJ) and the Diridon Station at the Diridon Intermodal Transit Center across from SAP Center in (the heart of downtown) San Jose. RFI Submission Deadline: August 6, 2021, 5:00pm
Contact
- Mary Talentinow
- (408) 321-5733
- [email protected]
CBS ID: 596013 | Published 8/2/2021 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.