This posting has been archived
#596048
•
Posted 8/2/2021
Canyon Lake Sewer Rehabilitation, Canyon Lake, CA
- Owner Reference
- C2012
- Bid Date
- Aug 26, 2021 at 10:00AM
- Pre-Bid
- Mandatory - 8/11/2021 @ 10:00am @ (for location please or )
- Owner
- Elsinore Valley Municipal Water District CA
Description
Scope of work includes rehabilitation of approximately 2,700 LF of 8-inch VCP sewer main and approximately 630 LF of existing 6-inch VCP sewer main utilizing trenchless technology construction methods (cured-in-place pipe (CIPP) lining or spiral wound lining). Spot repairs will be required prior to performing the lining. The project locations,
within the City of Canyon Lake, that will be impacted will be Granite Dome Place, San Joaquin Drive West, Inspiration Point, Lighthouse Drive and Lassen Drive. The work will also include the reinstatement of house laterals; sewer bypassing; and all other work as indicated in the Contract Documents. Project duration is 180 Calendar days with an anticipated start of Sept 2021. Questions are due by 10:00 am on Aug 19th. Bonds required. Prevailing wages apply.
Contact
- Kelia Jones
- (951) 674-3146
- [email protected]
CBS ID: 596048 | Published 8/2/2021 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.