This posting has been archived
#596061
•
Posted 8/2/2021
Paving of Residential & Major Streets / Rehabilitation Project, Baldwin Park, CA
- Owner Reference
- CIP-20-37
- Bid Date
- Aug 17, 2021 at 10:00AM
- Estimate
- $1,500,000.00
- Owner
- City of Baldwin Park PW
Description
The general nature of work consists of furnishing all labor, material, equipment, services, and incidentals required for AC pavement maintenance, sidewalk repairs and other concrete improvements. The AC pavement work includes grind and overlay of existing AC sections, removal and replacement of curbs and/or gutters, sidewalks, curb ramps, cross gutters, and other improvements and related work as shown on plans. Other improvements include the installation of detectable warning surfaces, pruning tree roots and installing root barriers. Related work includes construction surveying, adjusting manhole covers and utility covers to finished grade, relocating mail boxes, traffic control and all appurtenant work. Locations: 1. Walnut form Los Angeles St. to Palm Ave. 2. Merced from Ramona Blvd to Merced Ave 3. Baldwin Park Blvd from Kenmore to Bresee 4. Ramona Blvd from 605 Fwy to Syracuse Ave. 5.Fairgrove St. from Syracuse to Frazier St 6. Dalewood St. from Puente to I-10 Fwy and City limit. Bonds required. Prevailing wages apply.
Contact
- John Beshay (x459)
- (626) 960-4011
- [email protected]
CBS ID: 596061 | Published 8/2/2021 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.