This posting has been archived
#596067
•
Posted 8/2/2021
Shade Structure Installation and Playground Refresh Fall 2021, Escondido, CA
- Owner Reference
- 2022-01
- Bid Date
- Aug 30, 2021 at 02:00pm
- Pre-Bid
- Mandatory - 8/11/2021 @ 08:00am @ (for location please or )
- Owner
- Escondido Union High School District
Description
Scope of work includes but is not limited to: provide all labor, equipment, tools, materials, utility
services, and transportation to complete all of the Work. All of the Work must be in strict
accordance with manufacturer’s written instructions, technical specifications and plans.
Bernardo School – Provide and Install shade structure and add landscaping per site plans and
specifications.
Reidy Creek School – Provide and Install shade structure, refresh existing playground
equipment and install playground poured in place rubberized surface per site plans and
specifications.
Lincoln School – Provide and Install shade structure per site plans and specifications.
Conway School – Provide and Install shade structure per site plans and specifications. Bonds required. Prevailing wages apply.
Contact
- Julie Collins
- (760) 432-2323
- [email protected]
CBS ID: 596067 | Published 8/2/2021 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.